Skip to content

Chartering & Voyage

Suez Canal Toll Calculator

Estimate Suez Canal tolls in seconds. This Suez Canal toll calculator applies the Suez Canal Authority (SCA) transit dues schedule, the temporary surcharges in force since 15 July 2026 and the lump-sum service charge, and converts the result from SDR to US dollars. It is maintained by SENA Ship Management in Ismailia, home of the Suez Canal Authority.

Vessel & transit

SCNT

From the Suez Canal Special Tonnage Certificate. It is not the same as GT or NT.

Condition
Direction

Changes the surcharge for vehicle carriers only.

Surcharges & charges

% of dues

Official: 22% (Periodical 18/2026, from 15 Jul 2026).

Lump sum per transit, Circular 1/2026.

USD / SDR

Default is the IMF SDR rate of 6 Nov 2026. Enter today's rate for a current figure.

Estimated Suez Canal toll

Estimated total

$289,467

210,999 SDR in transit dues + $3,800 service charge

Normal transit dues
172,950 SDR
Temporary surcharge (22%)
38,049 SDR
Transit dues
210,999 SDR
In USD at 1.35388
$285,667
Service charge
$3,800
Total estimate
$289,467

Estimate only. Excludes tugs, port pilotage, agency fees and any rebate. The Suez Canal Authority alone sets the final dues.

Get an exact quote from SENA

Band breakdown — Dry bulk vessel, laden

SDR per SCNT from SCA Circular 7/2023, in force since 15 Jan 2024.

BandSCNT in bandRate (SDR)Dues (SDR)
First 5,0005,00010.1350,650.00
Next 5,0005,0007.7438,700.00
Next 10,00010,0006.1261,200.00
Next 20,00010,0002.2422,400.00
Normal transit dues30,000172,950.00

How to use the Suez Canal toll calculator

  1. Choose the vessel type. The Suez Canal Authority (SCA) groups ships into 13 rate categories, from crude oil tankers (Rate 1) to "other vessels" (Rate 13).
  2. Enter the Suez Canal Net Tonnage (SCNT). It is on the ship's Suez Canal Special Tonnage Certificate. Do not use gross or net tonnage under the 1969 Tonnage Convention: SCNT is measured differently and is usually higher.
  3. Select laden or ballast, and the direction. Ballast rates are lower. Direction only changes the surcharge for vehicle carriers.
  4. Check the surcharge. The calculator fills in the official temporary surcharge in force since 15 Jul 2026. If the SCA changes it, type the new figure.
  5. Update the exchange rate. Dues are set in Special Drawing Rights (SDR). Enter the day's USD per SDR rate from the IMF for an up-to-date dollar figure.

How Suez Canal tolls are calculated

Suez Canal transit dues are charged on the ship's SCNT in bands. The first 5,000 tons are charged at the highest rate, the next 5,000 at a lower rate, and so on, so large ships pay less per ton overall. Each band has a laden and a ballast rate in SDR per SCNT. On top of the normal dues, the SCA currently levies a temporary surcharge that depends on the vessel type, plus a lump-sum service charge in US dollars.

Normal dues = Σ (SCNT in each band × SDR rate for that band) Transit dues = Normal dues × (1 + surcharge %) containerships: (normal dues + deck-tier surcharge) × 1.12 Total (USD) = Transit dues × USD per SDR + service charge

Transit dues rates, SDR per SCNT (laden / ballast)

From SCA Circular 7/2023, in force since 15 Jan 2024 and still the current base schedule.

Vessel type (SCA rate)First 5,000Next 5,000Next 10,000Next 20,000Next 30,000Next 50,000Next 60,000*The rest
Crude oil tanker (1)11.04 / 9.407.82 / 6.645.91 / 5.042.93 / 2.502.53 / 2.142.17 / 1.85—2.13 / 1.82
Petroleum product tanker (2)11.04 / 9.407.82 / 6.645.91 / 5.043.93 / 2.503.84 / 2.143.46 / 1.85—3.34 / 1.82
Dry bulk vessel (3)10.13 / 8.627.74 / 6.586.12 / 5.212.24 / 1.891.97 / 1.681.85 / 1.58—1.77 / 1.50
LPG carrier (4)11.60 / 9.878.40 / 7.146.22 / 5.295.05 / 4.304.42 / 3.764.13 / 3.51—4.13 / 3.51
LNG carrier (5)10.42 / 8.878.11 / 6.897.02 / 5.975.43 / 4.615.03 / 4.274.80 / 4.08—4.67 / 3.97
Chemical / other liquid bulk tanker (6)11.55 / 9.818.92 / 7.587.12 / 6.065.19 / 4.424.63 / 3.944.35 / 3.70—4.27 / 3.63
Containership (7)11.04 / 9.407.58 / 6.455.89 / 5.004.13 / 3.513.82 / 3.253.01 / 2.562.94 / 2.522.88 / 2.44
General cargo / multi-purpose / heavy lift (8)10.08 / 8.587.78 / 6.625.42 / 4.614.07 / 3.453.94 / 3.363.87 / 3.30—3.80 / 3.22
Ro-ro vessel (9)10.08 / 8.587.50 / 6.375.83 / 4.974.21 / 3.593.94 / 3.363.80 / 3.22—3.65 / 3.12
Vehicle carrier (PCC / PCTC) (10)11.04 / 9.407.58 / 6.455.67 / 4.834.05 / 3.453.82 / 3.253.01 / 2.56—2.88 / 2.44
Cruise ship (11)9.97 / 8.487.00 / 5.965.77 / 4.914.08 / 3.484.03 / 3.423.90 / 3.31—3.76 / 3.19
Special floating unit (yacht, dredger, rig, tug…) (12)11.987.947.145.064.764.31—4.16
Other vessels (13)10.54 / 8.967.10 / 6.045.97 / 5.084.35 / 3.704.21 / 3.593.94 / 3.36—3.80 / 3.22

* Only containerships have a separate "next 60,000" band. Special floating units have one rate whether laden or in ballast. Ballast petroleum product tankers and ballast oil/chemical tankers pay ballast crude-oil-tanker rates; ballast combined carriers (OBO) pay ballast dry-bulk rates.

Temporary surcharges from 15 Jul 2026

The SCA raised its surcharges by 12 percentage points for most ship types, and introduced 12% surcharges for containerships and for southbound vehicle carriers. It describes them as temporary measures that can be amended or cancelled according to market conditions.

Vessel typeSurchargeReference
Crude oil tanker37% laden / 27% ballastPeriodical 16/2026
Petroleum product tanker37% laden / 27% ballastPeriodical 17/2026
Dry bulk vessel22%Periodical 18/2026
LPG carrier32%Periodical 19/2026
LNG carrier19%Periodical 20/2026
Chemical / other liquid bulk tanker32%Periodical 21/2026
Containership12% of total duesCircular 2/2026
General cargo / multi-purpose / heavy lift26%Periodical 22/2026
Ro-ro vessel26%Periodical 23/2026
Vehicle carrier (PCC / PCTC)26% northbound / 12% southboundPeriodical 24/2026
Cruise shipNoneno surcharge for passenger/cruise ships
Special floating unit (yacht, dredger, rig, tug…)26%Periodical 25/2026
Other vessels26%Periodical 26/2026

Service charge

Since 15 May 2026 (SCA Circular 1/2026) mooring is carried out from shore stations and each ship must carry its own compliant searchlight. A lump-sum service charge applies: USD 3,800 for ships of 2,500 GT and above and USD 2,350 below 2,500 GT. A ship without a compliant searchlight is fined USD 500 per transit.

Worked example: laden bulk carrier, 30,000 SCNT

A dry bulk vessel of 30,000 SCNT transits northbound, laden:

BandCalculationSDR
First 5,0005,000 × 10.1350,650
Next 5,0005,000 × 7.7438,700
Next 10,00010,000 × 6.1261,200
Next 20,000 (10,000 used)10,000 × 2.2422,400
Normal dues172,950
Dry bulk surcharge22% × 172,95038,049
Transit dues210,999

At USD 1.35388 per SDR (IMF, 6 Nov 2026) that is about USD 285,667, or about USD 289,467 with the USD 3,800 service charge.

What the estimate does not include

  • Tug charges, where the SCA requires escort or assisting tugs for the ship's size, draught or type.
  • Port pilotage, for example at Port Said, whose rates were revised from 15 July 2026 (Circular 3/2026).
  • Agency fees, port dues, waiting time at anchorage and the USD 500 searchlight fine.
  • Rebates and incentives. None is applied. The 15% rebate for containerships of 130,000 SCNT and above was suspended from 7 April 2026 (Periodical 3/2026).

SENA Ship Management is based in Ismailia, the home of the Suez Canal Authority. For a firm figure before a transit, contact our team.

Frequently asked questions

What is SCNT and where do I find it?
SCNT is Suez Canal Net Tonnage, the tonnage the SCA uses to charge transit dues. It is shown on the ship's Suez Canal Special Tonnage Certificate. It is measured under the canal's own rules, so it differs from the gross and net tonnage on the International Tonnage Certificate (1969) and is usually higher than the ITC net tonnage.
How much does it cost a container ship to transit the Suez Canal?
It depends on the SCNT. A laden containership of 100,000 SCNT pays 439,500 SDR in normal dues. With the 12% surcharge that becomes 492,240 SDR, or about USD 666,400 at 1.354 USD per SDR, before any deck-tier surcharge and the USD 3,800 service charge.
Why are Suez Canal tolls quoted in SDR?
The SCA sets transit dues in Special Drawing Rights, the IMF's basket currency, to reduce exchange-rate swings. Payment is accepted in US dollars, euros, pounds sterling, Japanese yen, Canadian dollars, Swiss francs, Chinese yuan and Swedish, Danish or Norwegian kroner.
Are the July 2026 surcharges permanent?
No. Each surcharge circular says the surcharges are temporary and can be amended or cancelled according to market conditions. That is why the calculator lets you edit the surcharge.
Do ships in ballast pay less?
Yes. Every band has a lower ballast rate, typically about 15% below the laden rate, and crude and product tankers also have a lower ballast surcharge (27% instead of 37%). Ballast product tankers and ballast oil/chemical tankers pay ballast crude-oil-tanker rates, and ballast combined carriers (OBO) pay ballast dry-bulk rates.
Is there a Suez Canal rebate at the moment?
The SCA publishes rebates for particular ship types or routes from time to time. The 15% rebate for containerships of 130,000 SCNT and above, introduced in May 2025, was suspended from 7 April 2026. This calculator applies no rebate, so check the current circulars or ask your agent.

Estimate for planning only, based on public Suez Canal Authority circulars (base schedule 7/2023, surcharges in force from 15 July 2026, Circular 1/2026 service charge). The SCA alone determines transit dues; confirm with your agent before transit.

Last reviewed 8 Nov 2026.

Work with SENA

Ready to put your fleet in safe hands?

Tell us about your vessels and we will come back with a tailored ship management proposal — usually within one business day.